Pru East MP calls for timely rehabilitation of Parambo-Sawaba water system

By Elsie Appiah-Osei, GNA  

Accra, Nov. 18, GNA- Mr Emmanuel Kwaku Boam, the National Democratic Congress (NDC) Member of Parliament for Pru, on Wednesday called on government to expedite the rehabilitation of the Parambo-Sawaba Water System to improve access to potable water for residents.   

Mr Boam raised the matter on the Floor of Parliament, in Accra, when he asked Mr Ahmed Ibrahim, the Minister for Works, Housing and Water Resources, for an update on the request for water supply intervention for the Parambo-Sawaba community, which had earlier been referred to the Community Water and Sanitation Agency (CWSA).  

He sought to know the steps being taken to fast-track the assessment and implementation of the intervention.  

Responding, the Minister, Mr Ibrahim, confirmed that the Parambo-Sawaba Water System was currently non-functional.  

“Mr. Speaker, the CWSA is undertaking a nationwide assessment of 98 broken-down water systems, including Parambo-Sawaba, to determine the scope of rehabilitation works required.  

“Upon completion of the assessment, the CWSA intends to prioritise the Parambo-Sawaba Water System for rehabilitation and include it among the first batch of facilities to be considered for reconstruction,” he said.  

The Minister also disclosed that the Ministry had been informed of a possible financial intervention through the Pru East District Assembly to support the rehabilitation.  

He told Parliament that the results of the technical assessment, together with a priced bill of quantities, would be shared with the District Assembly to facilitate resource mobilisation and support the timely restoration of the system.  

In a follow-up, Mr Boam drew attention to the wider water situation in the Pru East area, noting that about 99 communities were affected by limited access to safe water.  

“Mr. Speaker, residents have faced health challenges associated with unsafe water, including typhoid, with cases of intestinal perforation recorded in the area,” the MP said.  

According to him, the affected enclave had a population of close to 50,000 people, with the wider catchment estimated at over 500,000.  

He noted that while other interventions were ongoing, challenges related to the water table and hard water in the area remained and said the rehabilitation of the water systems would provide a sustainable solution.  

Mr Boam said the issue dates to 2022/2023 and urged that action should not be further delayed.  

GNA  

Edited by Benjamin Mensah  

Reporter: Elsie Appiah-Osei, GNA  

Reporter: [email protected]